NOTICE: The Clatsop County Board of Commissioners approved a new permit fee schedule for the Building Codes Division. These new fees will take effect July 1, 2012 and will be posted on this page on that date. Projects permitted before July 1 will not be subject to the new fee schedule.
Under Oregon law, local building permit services must be entirely fee-supported. Since 2008, revenue from permits has been insufficient to cover the costs of permit processing and inspections in the Clatsop County office.
The Building Official shall make the determination of value or valuation of the project. The value to be used in computing the building permit and plan review fees shall be the total value of all construction work as well as all finish work, painting, roofing, electrical, plumbing, heating, air conditioning, elevators, fire-extinguishing systems and other permanent equipment. It also includes the contractor’s profit which should not be omitted. Actual fees are determined by the Building Official based on valuation of the project. The Division policy as established by the Building Official for determination of the valuation of the project is based on the cost per square foot (published by the International Codes Council) or contractor’s valuation, whichever yields the greater value.
|
|
BUILDING Fee Schedule for
RESIDENTIAL, COMMERCIAL & INDUSTRIAL
MECHANICAL and FIRE PROTECTION SYSTEMS Fee Schedule for
COMMERCIAL and INDUSTRIAL
|
|
Minimum Permit Fee
|
$84.00
|
|
$501 to $2,000
|
$70.00 for the first $500
plus $2.64 for each additional
$100, or fraction thereof
|
|
$2,001. to $25,000
|
$110.00 for the first $2,000
plus $10.53 for each additional $1,000 or fraction thereof
|
|
$25,001 to $50,000
|
$352.00 for the first $25,000,
plus $7.90 for each additional $1,000 or fraction thereof
|
|
$50,001 to $100,000
|
$549.00 for the first $50,000,
plus $5.27 for each additional $1,000 or fraction thereof
|
|
$100,001 and up
|
$813.00 for the first $100,000,
plus $4.39 for each additional $1,000 or fraction thereof
|
|
MECHANICAL for Residential: New/Additions/Remodels or Alterations
|
|
Minimum Fee
|
$84.00
|
|
Air Handing Unit
|
$32.00 per appliance
|
|
Air Conditioning Unit
|
$44.00 per appliance
|
|
Alteration of Existing HVAC System
|
$32.00 per appliance
|
|
Heat Pump
|
$58.00 per appliance
|
|
Install/Replace Furnace
Up to 100,000 Btus
Over 100,000 Btus
|
$44.00 per appliance
$52.00 per appliance
|
|
Install/replace/relocate heaters, suspended, wall or floor mounted
|
$44.00 per appliance
|
|
Vent for appliance other than furnace
|
$32.00 per appliance
|
|
Appliance vent
|
$32.00 per appliance
|
|
Dryer exhaust
|
$32.00 per appliance
|
|
Hood
|
$32.00 per appliance
|
|
Exhaust fan connected to a single duct
|
$22.00 per appliance
|
|
Gas Piping
1 to 4 outlets
Each additional outlet
|
$18.00
$4.00
|
|
Fireplace/Woodstove
|
$32.00 per appliance
|
|
Other
|
$32.00 per appliance
|
|
Permit Issuance Fee
|
Included in permit schedule
|
|
Supplement Fees
|
Included in permit schedule
|
| |
|
PLUMBING for New One or Two-Family Dwellings
|
|
1 Bathroom
|
$286.00*
|
|
2 Bathrooms
|
$312.00*
|
|
3 Bathrooms
|
$352.00*
|
|
Each additional kitchen and/or bath
(or ½ bath)
|
$42.00
|
|
*includes first 100 feet of sanitary, storm and water service
|
|
Existing Residential: Additions/Remodels or Alterations
|
|
Minimum Fee
|
$84.00
|
|
Plumbing Fixtures (per)
|
$22.00
|
|
Water Service (first 100 feet)
|
$65.00
|
|
Sanitary Sewer (firest 100 feet)
|
$65.00
|
|
Storm Sewer (first 100 feet)
|
$65.00
|
|
Each Additional 100 feet or fraction thereof
|
$36.00
|
| |
|
PLUMBING for Commercial, Multi-Family and Industrial: New/Additions/Remodels or Alterations
|
|
Base Fee (3 or Fewer Fixtures)
|
$250.00
|
|
More than 3 fixtures: Base Fee plus per fixture cost over 3 fixtures
|
$22.00 per fixture
|
|
Water Service (first 100 feet)
|
$65.00
|
|
Sanitary Sewer (first 100 feet)
|
$65.00
|
|
Storm Sewer (first 100 feet)
|
$65.00
|
|
Each additional 100 feet or fraction thereof
|
$36.00
|
| |
|
MANUFACTURED DWELLING Placement
|
|
Manufactured Dwelling Placement (includes placement, electrical feeder, water/sewer connection)
|
$160.00 SW
$320.00 DW
$480.00 TW
|
|
Connection to an existing drain, sewer, storm and water
|
$61.50
|
|
Administration fee
|
$30.00
|
| |
|
MANUFACTURED or RV Park Development
|
|
Base Fee (includes 5 or fewer spaces)
|
$190.00
|
|
Each additional space
|
$33.00
|
|
Structures and storm sewer systems
|
Cost as outlined above for commercial
|
| |
|
ELECTRICAL
|
|
New residential 1,000 square feet or less (includes service)
|
$159.00
|
|
Each additional 500 square feet
|
$44.00
|
|
Limited energy with above fees
|
$51.00
|
|
Each manufactured home or dwelling service or feeder
|
$82.00
|
|
Service or feeder (installation, alteration or relocations)
200 amps or less
201 amps to 400 amps
401 amps to 600 amps
601 amps to 1000 amps
Over 1000 amps or volts
Reconnect only
|
$96.00
$127.00
$191.00
$286.00
$535.00
$82.00
|
|
Temporary service or feeder
200 amps or less
201 amps to 400 amps
Over 400 amps to 600 amps
Over 600 amps to 1000
amps
Over 1000 amps
|
$82.00
$114.00
$159.00
$286.00
$535.00
|
|
Branch Circuits (new, alteration or extension, per panel)
Branch circuits with
purchase of service or feeder
Branch circuits without purchase of service or feeder
First branch circuit
Each additional branch
circuit
|
$5.00 each
$63.00
$5.00
|
|
Miscellaneous (service or feeder not included)
Each well pump and alarm or irrigation
Each sign or outline lighting
Commercial limited
energy panel, alteration or
extension
Additional inspection
over the allowable
|
$ 82.00
$ 82.00
$ 82.00
$ 75.00
|
| |
|
MEDICAL GAS & PROCESS PIPING
|
|
Minimum Permit Fee
|
$84.00
|
|
$501 to $2,000
|
$58.00 for the first $500,
plus $2.54 for each additional $100 or fraction thereof
|
|
$2,001 to $25,000
|
$172.00 for the first $2,000,
plus $2.37 for each additional $1,000 or fraction thereof
|
|
$25,001 to $50,000
|
$290.00 for the first $25,000,
plus $2.20 for each additional $1,000 or fraction thereof
|
|
$50,001 to $100,000
|
$1167.00 for the first $50,000,
plus $2.11 for each additional $1,000 or fraction thereof
|
|
$100,001 and up
|
$2222.00 for the first $100,000, plus $2.45 for each additional $1,000 or fraction thereof
|
| |
|
NFPA 13-D Residential Fire Protection System
|
|
Square footage of dwelling and garage
|
Permit Fee
|
|
Up to 2,000 square fee
|
$216.00
|
|
2,001 – 3,600 square feet
|
$284.00
|
|
3.601 – 7,200 square feet
|
$420.00
|
|
Greater than 7,200 square feet
|
$554.00
|
| |
|
Other Inspections and Fees
|
|
Reinspection fees assessed under provisions of Section 108.8 or each additional inspection over the allowable
|
$75.00 each
|
|
|
$84.00 per hour**
$84.00 per hour**
$84.00 per hour**
**Or total hourly cost to the jurisdiction, whichever is the greatest. This cost shall include supervision, overhead, equipment, hourly wages, and fringe benefits of the employees involved.
|
|
Structural Plan Review Fee
|
75% of building permit fee
|
|
Fire and Life Safety Plan Review Fee
|
50% of building permit fee
|
|
Electrical Plan Review Fee
|
35% of electrical permit fee
|
|
Mechanical Plan Review Fee
|
35% of mechanical permit fee
|
|
Plumbing Plan Review Fee
|
35% of plumbing permit fee
|
|
Medical Gas/Process Piping Plan Review Fee
|
35% of permit fee
|
|
State Surcharge
|
12% of permit fee
|
|
Temporary Occupancy
|
$100.00
|
|
Permit Extension (1st extension no charge)
|
$50.00 ea
|
|
Replacement Electrical Label
|
$25.00
|
|
Agricultural Exempt Certificate
|
$30.00
|